gamecourts.com
  • Home
  • About Us
  • Outdoor Courts
    • Open Design Sports Tile
    • Designing & Pricing
    • Adjustable & Standard Goals
  • Indoor Courts
  • Ordering
    • Returns
Picture
Court Cost Calculator
Your court kit cost is:
Tile + Lines + Ramps + Freight
Picture
How Many Square Feet is Your Court?
1.  Overall Length x Overall Width = Square Footage
2.  Square Footage x Tile Price
              Example:  25 Feet Long x 20 Feet Wide = 500 SqFt
              500 SqFt   x $2.70 per SF = $1350
              Freight Depends on Zip Code & Shipment Size
3.  Tile Prices Decrease as The Quantity Increases
              1-1500 SF: $2.70 ea.
              1501-2500 SF: $2.65 ea.
              2501-4000 SF: $2.60 ea. 
              4001-7000 SF: $2.55 ea.
              7001-12000 SF: $2.50 ea.
              Over 12,000 SF: $2.45 ea.
Picture
Adding Inlaid Lines
Straight Lines can be incorporated into the design using 1.75" wide line pieces.   Lines cost $1.25 per foot and run the entire length or width of the court.  In the diagram above, there are 2 lines running the length and 1 run the width.  So if the court were 25' long and 20' wide, the total number of line pieces would be 25x2 + 20x1 for a total of 70.  70 x $1.25 = $87.50   
Picture
Adding Ramp EdgesRamp Edges can give the court a more finished look in addition to making courts roller skate & wheelchair friendly.   Ramp Edges cost $1.25 per foot.  In the diagram above, to add ramp edges to all four sides would there are 2 lines running the length and 1 run the width.  So if the court were 25' long and 20' wide, the total number of line pieces would be 25x2 + 20x1 for a total of 70.  70 x $1.25 = $87.50   
Picture

Freight Costs

Freight costs are determined by:
  • SIZE AND WEIGHT OF TOTAL ORDER
  • ZIP CODE
  • RESIDENTIAL OR COMMERCIAL ADDRESS (Schools/Churches slightly higher)
  • NECESSITY FOR LIFTGATE SERVICE (If you don't have a loading dock or forklift)


Typical USA shipping charges range from 10% to 25% depending on the above criteria.
Photo from liewcf